BREEAM Site Selection
Contents |
[edit] Aim and benefits
To encourage the reuse of land that has been previously developed and discourage the use of previously undeveloped land for building.
To encourage positive action to use contaminated land that otherwise would not have been remediated and developed.
To avoid land which has not been previously disturbed.
[edit] When to consider
RIBA Plan of Work 2013 - Stage 1: Preparation of Brief - as early as possible.
Once the site has been selected there is nothing that can be done to change the situation.
A site investigation report will be done at the earliest stage and should indicate if there is any contamination. But often it has already been decided that this is the site whether it is contaminated or not.
These credits are very difficult to choose to achieve as they are mainly situational.
[edit] Step by step guidance
[edit] Previously developed land credit
Was the site previously developed?
An early Site investigation report will detail this but often it is known by the design team from the onset.
As evidence, previous use will likely be detailed in the Design statement or Site investigation report. The Ecologists habitat survey may demonstrate previous land use. A Geotechnical and Geo-environmental interpretative report or Ground investigation report would also detail any previous uses.
The 2011 assessment asked that the previous development to have been within the last 50 years. It is common that the land has clearly had a previous land use but if not, historical maps can be used.
The design team must demonstrate that more than 75% of the site was previously used. The most straight forward method to demonstrate this is with an existing site plan showing the site boundary and the area of previously used land and the area of proposed development. Separate drawings can be used. The areas in m2 must be detailed so the 75% can be calculated.
There is a compliance note in relation to education assessments and use of playing fields.
[edit] Contaminated land credit
It is unlikely that a site would be chosen because it is contaminated but where there is a choice hopefully the client would choose it.
A ground investigation report or Geotechnical and Geo-environmental interpretative report would demonstrate that there is contamination.
A specialist in contamination would then likely compile a separate report or section on the contamination and the remediation measures required.
The ecology report may also detail some contamination as some non-native invasive species are contaminants. Currently the two species which currently qualify are Japanese knotweed and Giant hogweed. The DEFRA website provides more information on these species. 2014 assessments can approach the BRE if they find a species which acts as a barrier to development and see if it can qualify. The ecologist would likely be able to advise on the appropriate removal of invasive species.
The specialist report with the remediation instructions should be used as evidence but to achieve the credit the remediation must be carried out. For the design stage assessment, the team must confirm that the remediation is to be carried out as the specialist has instructed.
[edit] Questions to ask while seeking compliance
Was the site previously developed?
How much of the site was previously developed?
What was the previous land use?
How long ago was it developed?
Is there likely to be contamination?
Has the ground been investigated?
Has a habitat survey or environmental impact assessment been carried out?
[edit] Tools and resources
DEFRA website e.g.- https://www.gov.uk/contaminated-land
SEPA e.g.- https://www.sepa.org.uk/environment/biodiversity/invasive-non-native-species/
[edit] Tips and best practice
Make sure it is very clear for the auditor that 75% of the proposed site is on previously developed land.
[edit] Typical evidence
(All of these documents are not required).
Design statement
Geotechnical and Geo-environmental interpretative report
Confirmation of remediation
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- UK New Construction 2014
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
--Emma Houston 11:17, 18 Jan 2018 (BST)
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.